Throughout this project, L4 was able to work closely with the engineers to evaluate and pursue value-engineering solutions that integrated the best ideas of the group.
This reach required our operators to have minimal impact on the existing banks and place habitat and bank stabilization boulders from a very difficult position. This project did not allow us to access the banks from the river channel in all areas, however, we were able to achieve a structurally sound installation without causing damage to the native vegetation or compromising the structural integrity of the banks.