The Broadview 1 reach required our operators to have minimal impact on the existing banks and place habitat and bank stabilization boulders from a very difficult position. This project did not allow us to access the banks from the river channel, however, we were able to achieve a structurally sound installation without causing damage to the native vegetation or structural integrity of the banks.